Fuel consumption cut by 26
percent
|
|
A new furnace was being
planned at Ohio Valley Aluminum Company. The company was
generally satisfied with its existing burner equipment,
but wanted to see if any supplier other than the current
one would promise--and deliver--better performance than
had been achieved from furnaces on line at the time.
ITS was challenged in the form of a guaranteed end
result. ITS had to meet or exceed the operating
parameters of existing burner equipment within the
plant. If the new burner equipment failed to measure up,
ITS had to remove the burners at no charge to Ohio
Valley, and then install the competitive brand burners,
also at no charge to Ohio Valley.
|
|
Gaining A
Benchmark
|
|
To establish a baseline,
Ohio Valley and ITS monitored two existing furnaces in
the plant for 90 days. The statistics obtained gave both
parties a clear picture of all parameters and
established the targets ITS must meet or exceed.
|
|
Rising Above The Challenge
Armed with the 90-day test data, ITS went to work. In conjunction with its supplier, Stordy Combustion Engineering Limited of the UK, ITS put together a burner system designed to out-perform the furnaces tested at Ohio Valley.
The new Stordy burner was installed and the same test parameters were kept for 90 days so that the baseline data could be compared with the data from the previous test of existing furnaces.
|
This ultra-efficient burner system supplied by ITS is one of ten for the facility |
|
|
And The Winners
Are
|
|
The winners are Ohio Valley Aluminum, Stordy Combustion and ITS. Comparisons showcased the remarkable efficiencies of the new Stordy-equipped
furnace. The Company stated that fuel consumption was 25 percent less in the new furnace.
|
|

The Aftermath
|
|
Since installing the first
burner system, ITS has retrofitted another of Ohio
Valley's furnaces with it's higher efficiency Stordy
burners.
In addition, Ohio Valley has mandated that the company
change over to ITS burner systems for all melting and
holding furnaces in the plant.
Why the change? Gas usage and overall efficiencies, the
economics of it are just too good to ignore.
|
|
|